Customization: | Available |
---|---|
Material Processed: | Film |
Plastic Type: | Nylon |
Still deciding? Get samples of US$ 50000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hard Miscellaneous Plastic Recycling Washing Line
The Hard Waste Plastic Recycling And Cleaning Line Is Mainly Used To Recycle Plastic Products Used In Daily Life Consumption. Through The Classification, Crushing And Cleaning Of The Whole Process, Clean Renewable Raw Materials Are Obtained For Downstream Reuse And The Recycling Of Hard And Miscellaneous Plastics. The System The Raw Materials That Can Be Processed Include: .-PE, PP, LDPE, HDPE, PO, PS, EPS, ABS, PA, PC, PVC. The More Common Products Made From The Above Raw Materials Are: Hollow Consumer Goods, Plastic Toys, Small Plastic Household Items , Blue Plastic Vats, Etc.The Throughput Of The System: 1500 Kg/H~3000 Kg/H
Feature Of Product
-The Hard Miscellaneous Plastic Recycling And Cleaning Line Can Handle A Wide Range Of Plastics, And The Cleaning Process Is Mature. Equipped With A Chemical Hot Washing Module, The Material Cleaning Effect Is Better, And The Quality Of The Finished Product Is Stable And The Cleanliness Is High.
- The Whole Line Operation Can Adopt Intelligent Control, Integrated PLC Electric Control System, And Minimize On-Site Operation Labor
-Energy Saving And Environmental Protection, Equipped With Hot Detergent Circulation System, Cleaning Water Online Circulation System;
- The System Is Easy To Operate, One-Button To Open The Operation Mode, The Wearing Parts And Spare Parts Are Stable And Durable, And The Daily Maintenance Is Convenient
- Suitable For Cleaning All Kinds Of Plastic Products With High Toughness And Thickness Between 1-25 Mm.
- Using Circulating Water To Ensure The Cleaning Effect While Controlling The Water Flow And Evaporation.
- The Crushing System Adopts A Wear-Resistant Design To Ensure The System Can Run Continuously For A Long Time.
- The High-Speed Centrifugal Cleaning System Applies Corresponding Blade Impacts To Different Materials At A Suitable Rotation Speed
Strength To Achieve The Desired Cleaning Effect.
- The Cleaning Tank Drum Is Designed For Strong-Pressure Underwater Cleaning To Remove Residual Impurities.
-The Corresponding Centrifugal Dehydration And Hot Air Drying System Can Be Equipped According To The Moisture Content Set According To The Production Requirements.
- After Theoretical Calculation And Multiple Actual Measurements, The Details Of The Mechanical Operation Of The Crushing, Cleaning And Drying Links
Make Adjustments To Avoid Material Loss Due To Over-Handling.
-Automatic Control Of The Whole Line, Unifying The Interrelated Operation Of Each Tank, Predicting Possible Abnormal Situations
Functions To Ensure System Security.
Process Flow
Feeding → Shredding → Iron Removal → Sinking And Floating Separation → Crushing → Dehydration → Thermal Friction Dehydration Washing → Rinsing (High-Speed Washing) → Friction Dehydration → Rinsing → Dehydration → Winnowing Separation → Wind Blowing (Optional) → Optical Selection ( Optional) → Conveying → Packing
Specification
Model | Production Capacity | Installed Power | Production Line Length |
PE-300 | 300-400 | 70 | 11 |
PE-500 | 500-600 | 95 | 15 |
PE-1000 | 800-1200 | 170 | 30 |
PE-2000 | 1500-2000 | 210 | 37 |
Q. What are acceptable payment terms?
A. T/T or L/C at sight.
Q. What is the delivery time for the machines?
A. Usually it will be 50-60 days according to the situation of the order.
Q. What is the warranty time of the machines?
A. It will be 12 months since the acceptance of the machines or 15 months since delivery to the loading port.
Q. What about your after-sales service?
A. Engineers available to make installation, commissioning, training, and providing after-sales service overseas.
Q.How many electric, water, air need for the machines?
A.technical department supply the whole layout for workshop details.
Q. Can I operate machine if don't have experienced engineers?
A. (1) short-time engineers to customer company (5-15days)
(2) Year-time working as requirements
Q. Any quality checking before shipment?
A. 100% confirm, run and test machines before shipment with quality certificate
Q. How can u help us when face some technical problem?
A. 24 hours by e-mail, message, calling. If problems happens need engineer we will arrange the closest or agent in local country, or send Chinese Engineers to solve in 2 weeks.
Q. Where can we get spare part?
A. we choose International Brand that customer can find it in everywhere, such as Siemens, Omron, Delixi etc, or send parts by DHL, Fedex, TNT and other express.